BW-200LDR:

High Performance Decarboxylation Reactor

50-200L Crude Oil Decarboxylated in 4-6 hrs *Subject to material composition

Oil-Free Vacuum Pump

Utilizing a powerful oil-free vacuum pump, the BW-200LDR has the ability to remove volatile compounds, leading to an extremely efficient terpene strip prior to distillation.

Anti-foam System

The BW-200LDR includes an anti-foam system that allows for ‘set and forget’ operation; using a sensor, blow off valve, and an overhead mixer with VFD for mixing and foaming prevention.

Electrical

  • Certification: UL 508A Certified Industrial Control Panel
  • Power: 230VAC, 3ph, 60A
  • Plug: SCM563P6W

BW-200LDR, 200L Decarboxylation System

Beaker & Wrench’s BW-200LDR is a heated, mixed, vacuum-controlled stainless steel reactor vessel optimized for decarboxylation of 200L of crude extract in 4-6 hours depending on input material.

Heated Hose & Suction Load/ Pressure Unload

Loading and unloading material can be done through a heated hose without opening the reactor. A Clean In Place (CIP) nozzle is integrated into the reactor for easy cleaning.

BW-200LDR Features

Same-Day Install & Training

Dry Screw Vacuum Pump

Anti-Foam System

Suction Load / Pressure Unload

-50°C Refrigerated Condenser

One Plug Power Connection

What Comes With Your Product - Customer Success!

Onboarding

Our team will guide you through the initial delivery and training process so you know what to expect when we arrive.

Install & Training

Learn from the best as we educate your team on best practices and receive onsite, hands-on training from our dedicated professionals. 

One Year Warranty & Ongoing Support

Backed by our ISO 9001 certification, our team is always available to reinforce your lab with help and support.

Specifications

Beaker & Wrench’s BW-200LDR is a heated, mixed, vacuum-controlled stainless steel reactor vessel optimized for decarboxylation of 200L of crude extract in 4-6 hours depending on input material. Utilizing a powerful oil-free vacuum pump, the BW-200LDR has the ability to remove volatile compounds, leading to an extremely efficient terpene strip prior to distillation. The BW-200LDR  includes an anti-foam system that allows for ‘set and forget’ operation; using a sensor, blow off valve, and an overhead mixer with VFD for mixing and foaming prevention. There is a removable mixer shaft for easy tank access as well as a level sensor for easy filling. Loading and unloading material can be done through a heated hose without opening the reactor. A Clean In Place (CIP) nozzle is integrated into the reactor for easy cleaning. If you need to process smaller volumes of material, Beaker & Wrench also offers the BW-40LDR as well as custom equipment.

Product
BW-200LDR
Certifications

cUL-508A Certified Industrial Control Panel

Plug

SCM563P6W 60Hz

Electrical

230VAC, 3ph, 60A

Processing Time

4-6 hours for 200L of material

Just need a pump or maintenance supplies?

SHOP PUMPS SHOP SUPPLIES

Customer Reviews

Lion Labs

“We purchased our 6’’ system in 2020, we’ve been running it for almost four years now, one of the most impressive things about the system is our ability to increase output without having to add any labor from the processes we were running before.”

Red Mesa Science & Refining

“We needed much higher throughput and that’s where the 12’’ came in. A pair of 12’’ systems increased our throughput 4x from a 6’’ system to the point where we decided we needed to buy another pair of 12’’ systems.”

MFUSED

“From contact to install to getting started, the whole process was surprisingly simple. I’m making 3x times the product with way more confidence and a lot more profit. I just wish I’d made the leap sooner.”